Fuel Storage Tank Solution
Automated fuel terminals, from SPOB unloading to the dispenser nozzle. Designed, fabricated, built and commissioned by Rexline’s own teams.
One Contractor, One Control Room From SPOB to Dispenser
PT Rexline Engineering Indonesia designs, fabricates, builds, automates and commissions complete fuel storage and handling terminals for mining, port, industrial and power generation operations across Indonesia. Fuel is pumped straight off the SPOB into an automated tank farm, then loaded into road tankers and dispensed to site vehicles. Every pump, valve, tank level and dispenser runs on one Siemens PLC and SCADA system in the MCC room, your head office can follow the same screens live, and an automatic hydrant system protects the whole site.

How The System Work
Seven parts, one EPC contract and one Siemens SCADA system, all designed, built and commissioned by Rexline.
SPOB unloading and pumping station
Rexline’s pumps draw fuel straight from the SPOB, then filter and meter it on its way to the tanks.
Automated tank farm
Tanks from 10 to 2,000 kL with level transmitters, high-level alarms and motorised valves.
Truck loading gantry
Overhead loading bays for road tankers, metered and interlocked.
Light vehicle refuelling
Metered dispensers for site vehicles, fed through an emergency shutdown valve.
MCC and Siemens SCADA room
One screen starts pumps, moves valves and shows every level, flow and alarm.
Head office monitoring
The same live data at your head office over a secure link.
Automatic fire protection
Fire water tank, self-starting fire pumps, hydrant ring main, foam and monitors.
Any Capacity, From 10 KL to 2,000 KL
Compact and mobile tanks for small or relocatable operations, vertical cone-roof tanks for bulk storage. Each tank is sized to your consumption and delivery pattern, and specified to ESDM requirements and your project specification.

Drawn to one scale by volume to show the range. Final dimensions are set by the design for each site.


Typical tank features
- Vertical tanks designed to API 650
- Carbon steel shell with corrosion allowance
- Fixed cone roof with roof handrail
- Stairway and roof access platform
- Internal and external fuel-grade coatings
- Manholes, nozzles, vents and flame arrestors
- Level transmitter and high-level alarms
- Overfill protection with motorised valves
- Bund wall and secondary containment
Engineered to API 650, Drawn In-House
An extract from the general arrangement of a 500 kL diesel tank designed by Rexline’s Engineering Division. Our tanks are engineered, detailed and checked like this before fabrication starts in Lamongan.
Tank elevation and roof framing plan from Rexline drawing REX-029-M-GA-240, fuel storage tank T-101, 500 kL.
Design data
- Design code
- API 650, 13th edition
- Product
- Diesel B40, specific gravity 0.88
- Usable capacity
- 500 m³
- Tank size
- 9,700 mm ID × 7,512 mm shell height
- Shell
- 8 mm lower three courses, 6 mm upper two
- Bottom and roof
- 8 mm bottom; 7 mm cone roof at 1:12 on rafters and trusses, no centre column
- Corrosion allowance
- 2 mm on shell, bottom and roof
- Design loads
- Wind 144 km/h; seismic Ss 0.12, S1 0.07; 45 °C
- Materials
- ASTM A36 plate; A106 Gr B pipe; A105 flanges
- Tests
- Full-water hydrotest; spot radiography
- Coating
- Sa 2½ blast; external 315 µm three-coat system; internal 75 µm primer
- Weights
- Empty 22 t; operating 495 t; hydrotest 558 t
SPOB Unloading
Fuel comes straight off the SPOBRexline’s unloading pumps draw your fuel directly from the SPOB at the jetty and deliver it, filtered and metered, into the tank farm. The operator starts, watches and stops each transfer from the SCADA screen.
What’s included
- Unloading pumps in a duty and standby arrangement
- Suction strainer and filter with differential-pressure monitoring
- Flow meter with live flow on the SCADA screen
- Pressure switches and explosion-proof pressure transmitters
- Motorised valves opened and closed from SCADA
- Emergency shutdown valves on the transfer line
- Jetty hose connection, pipeline, supports and expansion loops
The transfer line as configured on the SCADA of the Merauke terminal, with its instrument tags.
Tank Farm
Every tank on one screenEach tank carries a level transmitter, high and high-high level alarms and motorised inlet and outlet valves, all wired to the Siemens PLC. The operator sees every level in real time, and interlocks stop filling before a tank can overfill.


- Tanks from 10 to 2,000 kL, horizontal or vertical
- Level transmitter on every tank
- High and high-high level alarms with interlocks
- Motorised inlet and outlet valves
- Manifold, pipe trench and cable trays
- Bund wall and secondary containment
- Stairways, roof handrails and access platforms
- Fuel-grade internal and external coatings
Truck Loading
Road tankers loaded fast and safeA dedicated loading pump feeds the overhead gantry, where each bay fills a road tanker through a metered loading arm. Earthing and bonding, automatic shut-off and interlocks protect every load.
What’s included
- Overhead gantry with loading arms or hoses
- Dedicated loading pump and motorised valve
- Flow meters and batch controllers
- Automatic shut-off and interlocks
- Earthing and bonding for every truck
- Spill containment and drip trays
- Platform, stairs and handrails under a roof


Vehicle Refuelling
Vehicles refuelled and recordedMetered dispensers under a steel canopy serve light vehicles and service trucks. They draw from the tank farm through an emergency shutdown valve, and the litres issued at each dispenser show on SCADA.
What’s included
- Metered dispensers, sized to your fleet
- Supply from the farm through an emergency shutdown valve
- Litres per dispenser shown on SCADA
- Steel canopy with lighting over the islands
- Fire extinguishers at the islands
- Spill containment and drainage
- Driver identification and authorisation, where required
Control Room
One screen runs the terminalThe MCC and the Siemens PLC and SCADA sit together in one air-conditioned control room. From one workstation the operator starts the pumps, opens and closes every motorised valve, and watches every level, flow and alarm. A panel-mounted HMI gives the same view at the MCC.


On screen, live
- Tank levels and high-high alarms
- Valve positions and interlocks
- Flow in litres per minute
- Litres issued per dispenser
- Pump status and run timers
- Remote and local operating modes
Head Office
Watch your fuel from head officeThe SCADA that runs the terminal also serves its data over a secure link, so your head office sees the same levels, flows and alarms as the operator on site.
Remote or local

Every pump and valve runs in Remote, from the SCADA workstation, or Local, at the panel. The mode shows on screen.
Control stays on site
The Siemens PLC keeps the terminal running if the head-office link drops. The link carries monitoring and reports, with access set by your IT policy.
What head office sees
- Stock level in every tank
- Flow on the unloading and loading lines
- Litres issued at each dispenser
- Alarm and event history

Fire Protection
Fire protection that starts itselfA pressurised hydrant ring main surrounds the tank farm. When a hydrant or monitor opens, the fire pumps start automatically, and the status of the whole fire system shows on SCADA with the rest of the terminal.
1Prevent
- High and high-high level alarms
- Overfill interlocks on tank inlets
- Earthing and bonding at loading points
- Automatic shut-off at the gantry
2Detect
- Flame and gas detection
- Smoke and heat detectors
- Fire alarm and notification
- Fire system status on SCADA
3Suppress
- Fire water storage tank
- Electric and diesel fire pumps, duty and standby, with automatic start
- Hydrant ring main, hydrants and hose reels
- Monitor nozzles for tank and bund protection
- Fixed foam pourers and foam chambers
4Contain and shut down
- Emergency shutdown valves
- Emergency stop stations
- Bund walls and secondary containment
- Spill containment and drip trays
Design, Fabricated, Build and Commissioned by Rexline
Rexline is one of the few contractors in Indonesia that delivers a complete fuel terminal with its own people, from the first drawing to a live SCADA screen. One team carries the job from start to finish, so nothing falls between contractors.

1Engineering
Process design, tank and structural calculations, P&IDs, electrical and control design, from our Surabaya office.

2Fabrication
Shell plates, roofs, piping spools and steelwork from our own fabrication facility in Lamongan.

3Construction
Foundations, tank erection, piping and civil works by our own site crews.

4Automation
Control panels, Siemens PLC and SCADA engineered and programmed by our own team.

5Commissioning
Hydrostatic tests, loop checks, and cold and hot commissioning.

6Handover and support
Operator training, as-built drawings, O&M manuals, PHO and FHO support.
One contract, one schedule
No separate tank, piping, electrical and automation contracts for you to coordinate.
Nothing lost between packages
The team that designs a tank also wires the level transmitter that protects it.
Support from the builders
Faults are traced by the people who built and programmed the system.
From Tank Pad to Live Terminal
Our crews take each tank from bare ground to mechanical completion. Every tank is hydrostatically tested before it goes into service.
Complete Scope, One Contract
Rexline delivers the full civil, mechanical, electrical, instrumentation, automation and fire and safety scope, with the engineering behind it.
Engineering
- PFDs and P&IDs
- General arrangement drawings
- Civil and structural calculations
- Electrical single-line diagrams
- PLC and SCADA architecture
- Fire and safety philosophy
Civil
- Tank foundations and ring beams
- Bund walls and containment slabs
- Pump house, fire pump house and control room
- Pipe racks, sleepers and trenches
- Roads, drainage and hardstands
Mechanical
- Tank fabrication and erection
- Pump and equipment installation
- Piping fabrication and erection
- Valve installation and alignment
- Hydrostatic and pressure testing
Electrical and instrumentation
- Power distribution and cabling
- MCC and PLC panels
- Instrument installation and calibration
- Earthing and lightning protection
- Area and emergency lighting
Automation
- Siemens PLC programming
- SCADA screens, alarms and trends
- Head-office remote monitoring
- Data logging and reports
Fire and safety
- Fire water tank and fire pumps
- Hydrant ring main and monitors
- Foam systems for tanks
- Flame, gas, smoke and heat detection
- Emergency shutdown system
Pre-commissioning and inspection, mechanical completion, cold and hot commissioning, integrated fire and safety tests, performance testing, operator training, as-built drawings and O&M manuals, PHO and FHO support.
Built to API 650, ESDM and SNI
Codes and standards
- API 650, 13th edition, welded steel tanks for oil storage
- Kementerian ESDM requirements for fuel storage installations
- SNI 1729:2020, steel structures
- SNI 1726:2019, earthquake-resistant design
- SNI 1727:2020, minimum design loads
- SNI 03-1745, standpipe and hose systems
- SNI 03-3985, fire detection and alarm systems
- SNI 03-3989, automatic sprinkler systems
- SNI ISO 12944, protective paint systems for steel
- Relevant SNI and international codes for piping, welding, electrical and instrumentation, and your project specification
Where our fuel systems work
- Mining: coal, nickel, gold and copper operations
- Ports and jetty terminals: SPOB and tanker unloading
- Power generation: fuel supply for power plants and gensets
- Sugar and agro-industry: harvest fleets and mills
- Fertiliser and process plants
- Remote depots and logistics hubs
Safe, automated and regulation-compliant fuel storage and handling facilities, engineered to protect people, assets and operations and to keep your fuel supply reliable.